Texas Parks and Wildlife Commission

MATERIAL CONTRACT CHANGES FOR COMMISSION REVIEW
Contract Number Vendor Name Type of Contract Reason for Change Original Term Date Revised Term Date (if applicable) Original Contract Amount Revised Contract Amount (if applicable) Percentage Change Purchaser Division
462865 Solis Heating and Air Conditioning Internal Repair This internal repair of the ice machine required the vendor to make two additional trips to finalize the repairs, which increased the expected cost. 3/31/2015 4/30/2015 $100.00 $150.00 50.00% Gwen Sullivan Matador WMA
464281 Action Heating and Air Conditioning Internal Repair This internal repair of the Black Gap WMA Bunk House HVAC system required additional parts and labor to repair hail-damaged copper line on condensing unit, plus re-charge lost freon due to breach in copper line. 5/29/2015 n/a $450.00 $825.00 83.33% Gwen Sullivan Black Gap WMA
461669 AD Land Management LLD dba Davis Boat RV Storage Boat Storage Added additional stall to contract effective 07/15/15 3/31/2017 n/a $7,920 $11,310.44 42.80% Christy Orr-Petrolawicz LE – Ft Worth Regional